The final parcel confirmation stage for the designation of the housing site development district by Minister Byeon Chang-heum

Appeared on Yonhap News TV… GTX A, B, C route extension revealed that it is virtually difficult

Minister Byeon Chang-heum

Minister of Land, Infrastructure and Transport Byeon Chang-heum indicated that the announcement was imminent, saying that it is in the final stage of determining the last lot to designate a housing site development district.

Minister Byun appeared on Yonhap News TV on the 16th and was asked about the announcement of the housing supply area. “The last lot is confirmed in the process.”

The Ministry of Land, Infrastructure and Transport has announced that it is planning to announce the housing sites in two or three times within the first half of this year as soon as discussions with the relevant local governments are completed.

Then, Minister Byeon said that the urban public housing complex project, which develops high-density development of station areas, semi-industrial areas, and low-rise residential areas, requires the consent of the residents, so the area has not been determined. “If you explain, more and more people ask for consulting first. “Please designate it as a planned district, and I expect that there will be requests to designate it as this district.”

He emphasized that he will pursue the’Residential New Deal’ in earnest to solve various problems in our society such as balanced regional development, change in demographic structure, and climate change through a housing platform that combines life, work, and welfare.

At the same time, he announced that he would announce the housing new deal two months later in the’Princess Leadership 3080+’ measures announced on the 4th, and he added that he reported this to President Moon Jae-in in more detail.

Minister Byeon also explained that it will expand consumers’ housing options and options by re-establishing the types of housing that can be afforded such as equity accumulation, redemption condition, and land rental.

Minister Byeon pointed out that there are still many doubts that it is difficult for public institutions to lead maintenance projects to increase supply. “Public institutions such as LH and SH have professionalism, financial power, rapid administrative processing ability, and reliability.” “I think that it will be beneficial to increase assets while improving the residential environment, so we can secure enough consent from building owners and landlords.”

In addition, Minister Byeon said that this year, balanced national development was set as the core business goal of the Ministry of Land, Infrastructure and Transport. “It is time to actively consider ways to balance the region by combining the metropolitan area with local projects or by giving the development profits from the metropolitan area to the provinces. “I said.

When asked if he is considering a plan to create or extend a new metropolitan express train (GTX) route, he said, “We plan to finalize the 4th national rail network construction plan by the first half.” “We are reviewing the feasibility of the plan to establish D).”

Minister Byeon said that although there is a request to extend the GTX A, B, and C routes, there is a fear that the existing business plan will be delayed, so “it is difficult to integrate and promote the same project.”

However, he added that if a private business entity or local government proposes an extension of the GTX route that has secured business feasibility in the future project promotion process, it is considered that it is possible to further review it.

/yunhap news

Source