靑 “文, handed over”… Secretary Mun said, “It is a lie that’the power plant USB handed over'”

Input 2021.01.31 10:05 | Revision 2021.01.31 13:11

“I am the presidential secretary during the 4.27 summit”
April 30, 2018 Spokesperson 靑 “PT has a power plant content”
At that time, the contents of the USB contents or the contents of the talks were not disclosed.
Seung-min Yoo “The situation that even elementary school students will think about promoting the North Korean nuclear power plant… reveal the truth”

Former Blue House Protocol Secretary Cho Han-gi said on the 31st that President Moon Jae-in gave North Korean leader Kim Jong-un to the North Korean State Council Chairman Kim Jong-un at the 4/27 Panmunjom Dobodari Summit on whether or not the contents of the construction of North Korean nuclear power plants were included. He called the suspicion “malicious distortion”.

Former secretary Cho insisted on Facebook that day, “I was a protocol secretary at the time, and I was in the field with North Korean manager Kim Chang-seon.” Former secretary Cho, who was the first medical secretary of the Blue House in the Moon Jae-in administration, assisted President Moon until August 2019. After that, he ran for Taean in Seosan, Chungcheongnam-do in the 4·15 general election, but failed.



On March 5, 2018, the then chief envoy Eui-yong Eui-yong (Head of the National Security Office) shakes hands with North Korean leader Kim Jong-un in Pyongyang. The special delegation to North Korea included National Intelligence Service Director Seo Hoon, Chun Hae-seong, Vice Minister of Unification, Kim Sang-gyun, Second Deputy Chief of the National Intelligence Service, and Yoon Kun-young, head of the Blue House National Affairs Office. The interview and dinner were held at the Jindalrae Hall in the main building of the Chosun Labor Party. This was the first time a South Korean official visited the main building of the Chosun Labor Party. /Blue house

“The article that President Moon Jae-in handed the power plant USB to Chairman Kim Jong-un in Panmunjeom Dobodi-ri is, of course, false,” said former secretary Cho. “A malicious distortion reminiscent of implicitly that the two leaders would have made a deal under water,” he said. He also said, “It’s just amazing to be able to distort scenes broadcast live all over the world…”

However, contrary to the claims of former secretary Cho, according to data from the Blue House, President Moon spoke with Kim Jong-un for 44 minutes while walking through Dobo-ri and sitting on one side of the bridge during the April 27 meeting. In the process, President Moon delivered the USB to the North Korean State Council chairman, and the contents of the power plant were included, the Blue House said.

All of the meetings between President Moon and Kim Jong-un were revealed through video. In the video, the voices of the two tops were muted. However, as a result of analyzing the shape of the mouths of the two leaders through experts at the time, it was found that President Moon said to Kim Jong-un as “the power plant problem…”



Documents related to the North Korean nuclear power plant promotion by the Ministry of Industry/Chosun DB

As the media inquiries continued, a key member of the Blue House at the time delivered President Moon’s remarks, saying, “It seems that we have never discussed that (letter issue) verbally.” I made it (saved on USB) and handed it over to Kim Jong-un. In that PT video, there is a content related to the power plant.” Former secretary Cho served as a protocol secretary at that time, and the president’s message usually comes through the protocol secretary.

However, the Blue House did not disclose the contents of the conversation as well as the USB contents. The Ministry of Industry produced several documents related to the North Korean nuclear power plant in early and mid-May of that year, a month later. At the 2019 New Year’s speech, six months after the Dobodari talks, Kim Jong-un gave a message about nuclear power plants, saying, “Let’s build tidal power, wind power, and nuclear power generation capabilities.”

And officials of the Ministry of Industry illegally deleted these files in December 2019 just before the audit of Wolseong nuclear power plant No. 1 by the Audit Office. All these files were placed in a folder called ’60 pohjois’. ‘pohjois’ means’north’ in Finnish. There was also a sub-folder called’North Korea’ (North Korean nuclear power plant construction promotion plan).

On the previous day (30th), former lawmaker Yoo Seung-min said, “At the Dobodi-ri meeting, the data that President Moon Jae-in handed to Chairman Kim Jong-un had a’power plant-related issue’,” a spokesman at the Blue House confirmed. “Go ahead,” he said. “By looking at the evidence presented, it is a situation that even elementary school students can think that the Korean government was trying to promote the construction of a nuclear power plant in North Korea.” He said, “Uncover the truth.”

However, former secretary Cho posted a post on Facebook the day before (30th), saying, “I worked as a presidential protocol secretary during the April 27th Panmunjom summit, and during the 9.19 Pyongyang summit of that year, except for the time to sleep as an affiliated secretary. He said, “There was no discussion anywhere about building a nuclear power plant in North Korea.”



Former Presidential Protocol Secretary Jo Han-gi Facebook Capture

.Source